  • ClientMultiTurkmall Yirmibeş Gayrimenkul Yatırım İnşaat ve Ticaret A.Ş.
  • LOCATIONMerter, İstanbul
  • COMMENCEMENT DATE28.12.2007
  • COMPLETION DATE23.05.2011
  • MAIN CONTRACTORYapı-Yorum JV
  • PLOT106,000 m2
  • TOTAL CONSTRUCTION AREA377,000 m2

Marmara Forum Project comprising an office building of nearly 30,000 m² closed area, may be qualified as the big¬gest closed commercial complex in Istanbul when its nearly 330, 000 m² closed construction area is considered.

Architectural Design: Tabanlıoğlu Mimarlık ve Danışmanlık, İstanbul, Turkey

Structural Design: MPI Mühendislik Proje İnşaat, İstanbul, Turkey

Mechanical Design: GN Mühendislik Taahhüt, İstanbul, Turkey

Electrical Design: HB Elektrik Proje ve Müşavirlik, İstanbul, Turkey

Landscape Design: Trafo Mimarlar DS Mimarlık Hizmetleri, İstanbul, Turkey


Consultants

Soil Consultant: Prof. Dr. Orhan Erol, METU

Fire Consultant: Dr. Kazım Beceren, ITU